![]() The PIC must accomplish 3 take-offs and landings in the preceding 90 days (for currency purposes). The FAA’s UAS Integration Office (AFS-80) may be contacted if questions arise regarding updates or revisions to the operating documents.ġ6) Prior to operations conducted for the purpose of aerial videography/cinematography and augmenting real estate listing videos (or similar operations), the PIC must have accumulated and logged, in a manner consistent with 14 CFR 61.51(b), a minimum of 5 hours as UAS pilot operating the make and model of the UAS to be used in operations under the exemption 5 hours make and model time may be included in the 10 hours of multi-rotor time prescribed above. If the operator determines that any update or revision would affect the basis upon which the FAA granted this exemption, then the operator must petition for amendment to its grant of exemption. The operator must also present updated and revised documents if he petitions for extension or amendment to this grant of exemption. It is the operator’s responsibility to track such revisions and present updated and revised documents to the Administrator upon request. ![]() The operator may update or revise its operating documents. ![]() Otherwise, the operator (Trudeau) must follow the procedures as outlined in its operating documents. If a discrepancy exists between the conditions and limitations in this exemption and the procedures outlined in the operating documents, the conditions and limitations herein take precedence and must be followed. 6) The operating documents and this grant of exemption must be accessible during UAS operations and made available to the Administrator upon request. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |